Track Fixing Materials for Kunming Metro Line 5
May 29, 2021
Anyang Railway Equipment Co., Ltd(AT) provided e-clip for III-type separate fastening systems, screw bolts for III-type separate fastening systems, iron pad for III-type separate fastening systems, plain washers for III-type separate fastening systems, adjusting fastening plates etc railroad track fixing materials for Kunming Metro Line 5.
Kunming is the capital of Yunnan Province and the central city of the central Yunnan urban agglomeration, China. Kunming enjoys the reputation of "Spring City" due to its location in the low-latitude plateau.
Kunming Rail Transit is an urban rail transit system serving Kunming City and its surrounding areas in Yunnan Province.
Till September 2020, Kunming Metro has opened 5 operating lines, namely Kunming Metro Line 1, Kunming Metro Line 2, Kunming Metro Line 3, Kunming Metro Line 4, and Kunming Metro Line 6.
Kunming Rail Transit Line 5 is a rail transit line under construction in Kunming City, Yunnan Province, China. Construction started in October 2016. On January 15, 2022, Line 5 officially started its no-load trial operation.
As of February 2022, the first phase of Kunming Rail Transit Line 5 has a total length of 26.45 km, the length of underground line is 19 km, and the length of elevated line is 7.5 km; there are 22 stations, 15 underground stations, and 7 elevated stations. ; Set up 1 parking lot and 1 depot; the train adopts 6-car grouping B-type train.
Kunming is the capital of Yunnan Province and the central city of the central Yunnan urban agglomeration, China. Kunming enjoys the reputation of "Spring City" due to its location in the low-latitude plateau.
Kunming Rail Transit is an urban rail transit system serving Kunming City and its surrounding areas in Yunnan Province.
Till September 2020, Kunming Metro has opened 5 operating lines, namely Kunming Metro Line 1, Kunming Metro Line 2, Kunming Metro Line 3, Kunming Metro Line 4, and Kunming Metro Line 6.
Kunming Rail Transit Line 5 is a rail transit line under construction in Kunming City, Yunnan Province, China. Construction started in October 2016. On January 15, 2022, Line 5 officially started its no-load trial operation.
As of February 2022, the first phase of Kunming Rail Transit Line 5 has a total length of 26.45 km, the length of underground line is 19 km, and the length of elevated line is 7.5 km; there are 22 stations, 15 underground stations, and 7 elevated stations. ; Set up 1 parking lot and 1 depot; the train adopts 6-car grouping B-type train.