In 2019, Anyang Railway Equipment Co., Ltd(AT) provided different railroad fastening systems for Korla-Kashgar Railway Expansion and Reconstruction Project, the goods included Railroad Type II Fastening systems with Type II rail elastic clips, standard as per TB/T1495.
Ge'ermu-Ku'erle Railway is a national railway I-class passenger and cargo line connecting Golmud City, Haixi Mongolian and Tibetan Autonomous Prefecture, Qinghai Province, and Korla City, the capital of Bayingoleng Mongolian Autonomous Prefecture, Xinjiang Uygur Autonomous Region. The electrified railway is an important part of the skeleton of the road network in Northwest China and is known as the "New Silk Road in the Desert".
The Geku Railway started construction on December 28, 2014. On May 26, 2017, the Qinghai section started track laying work. On June 3, 2017, the Xinjiang section started track laying work. On June 30, 2020, it opened. Operate the Qinghai section.
The Geku Railway runs from Golmud Station to Korla Station. The total length of the main line is 1213.7 km, of which 505.6 km in Qinghai and 708.1 km in Xinjiang, with a design speed of 120 km/h.
On December 9, 2020, the Geku Railway from Korla, Xinjiang to Golmud, Qinghai, a national key railway construction project that took six years to build, was put into operation.
Ge'ermu-Ku'erle Railway is a national railway I-class passenger and cargo line connecting Golmud City, Haixi Mongolian and Tibetan Autonomous Prefecture, Qinghai Province, and Korla City, the capital of Bayingoleng Mongolian Autonomous Prefecture, Xinjiang Uygur Autonomous Region. The electrified railway is an important part of the skeleton of the road network in Northwest China and is known as the "New Silk Road in the Desert".
The Geku Railway started construction on December 28, 2014. On May 26, 2017, the Qinghai section started track laying work. On June 3, 2017, the Xinjiang section started track laying work. On June 30, 2020, it opened. Operate the Qinghai section.
The Geku Railway runs from Golmud Station to Korla Station. The total length of the main line is 1213.7 km, of which 505.6 km in Qinghai and 708.1 km in Xinjiang, with a design speed of 120 km/h.
On December 9, 2020, the Geku Railway from Korla, Xinjiang to Golmud, Qinghai, a national key railway construction project that took six years to build, was put into operation.