Railroad Fastening Systems for Guangzhou Metro Line 13
May 29, 2021
Anyang Railway Equipment Co., Ltd(AT) provided III-type railroad fastening systems with III-type separate elastic clips, heavy-duty spring gaskets, plain gaskets, rail bolts for P60 steel rails etc for Guangzhou Metro Line 13.
In the case of increasingly serious urban traffic congestion, the construction of subway tunnel has been put on the agenda by more and more cities.
Anyang Railway Equipment Co., Ltd. provides a variety of Rail Fastener products for Guangzhou Metro Line 3, 4, 8, and 13.
Shield tunnel construction has been developed for a century and a half. It has become increasingly mature in technology and has the advantages of less impact on the environment, low cost, and wide application. Anyang Railway Equipment Co., Ltd. has provided a large number of Tunnel Segment Bolts for the construction of Guangzhou's subway.
Guangzhou Metro Line 13 is one of the lines completed and operated by Guangzhou Metro. The first phase of the Guangzhou Metro Line 13 was opened on December 28, 2017.
As of November 2020, Guangzhou Metro Line 13 has a total length of 27.03 km, all of which are underground lines; a total of 11 stations are set up, all of which are underground stations; 8-groups A-type trains are used, which is the first train in Guangzhou Metro to use 8A groups train line.
In the case of increasingly serious urban traffic congestion, the construction of subway tunnel has been put on the agenda by more and more cities.
Anyang Railway Equipment Co., Ltd. provides a variety of Rail Fastener products for Guangzhou Metro Line 3, 4, 8, and 13.
Shield tunnel construction has been developed for a century and a half. It has become increasingly mature in technology and has the advantages of less impact on the environment, low cost, and wide application. Anyang Railway Equipment Co., Ltd. has provided a large number of Tunnel Segment Bolts for the construction of Guangzhou's subway.
Guangzhou Metro Line 13 is one of the lines completed and operated by Guangzhou Metro. The first phase of the Guangzhou Metro Line 13 was opened on December 28, 2017.
As of November 2020, Guangzhou Metro Line 13 has a total length of 27.03 km, all of which are underground lines; a total of 11 stations are set up, all of which are underground stations; 8-groups A-type trains are used, which is the first train in Guangzhou Metro to use 8A groups train line.