Rail Fastener System for Guangtong-Dali Railway
Jun 05, 2021
In 2010, Anyang Railway Equipment Co., Ltd(AT) provided Type I rail fastenering System for Guangtong-Dali Railway Expansion and Reconstruction Project, Standard as per TB/T1495.
In 2017, Anyang Railway Equipment Co., Ltd. provided a total of 540,804 sets of P60 insulated protect rail fastener systems, protect rail shuttles, P50 protect rail fastener systems, and P50 insulated rail fastener systems to the Guangtong-Dali Railway.
The old line of Guangtong-Dali Railway (Old Guangda Railway) is a joint venture railway and a national second-class single-track railway. It starts from Guangtong Station of Yunnan Section of Laocheng-Kunming Railway in the east and goes westward through Chuxiong City, Nanhua County, Xiangyun County, Midu County of Yunnan Province to Xiaguan, Dali City, with a total length of 213 km of which 109 km are in Dali Prefecture.
In 2017, Anyang Railway Equipment Co., Ltd. provided a total of 540,804 sets of P60 insulated protect rail fastener systems, protect rail shuttles, P50 protect rail fastener systems, and P50 insulated rail fastener systems to the Guangtong-Dali Railway.
The old line of Guangtong-Dali Railway (Old Guangda Railway) is a joint venture railway and a national second-class single-track railway. It starts from Guangtong Station of Yunnan Section of Laocheng-Kunming Railway in the east and goes westward through Chuxiong City, Nanhua County, Xiangyun County, Midu County of Yunnan Province to Xiaguan, Dali City, with a total length of 213 km of which 109 km are in Dali Prefecture.