18,100 Sets of Various Railway Fastening Systems Supplier for Shenyang Metro Line 1

Aug 05, 2023
Shenyang Metro Line 1 East Extension Line Mantang Parking Lot and Line 1 Thirteenth Street Vehicle Base Renovation and Expansion Project. The main line is approximately 16.21km long, and both are underground lines. There are 10 stations in total, one of which is a transfer station. The maximum station spacing is 2.79km (Donngling Park~Zhongshui Street), the minimum station spacing is 1.18km (Buguan Street~Expo Park), and the average station spacing is about 1.64km. There is one Mantang parking lot and one main substation (located in the Mantang parking lot). The control center is connected to the existing Metro Line 1. Expand the existing utilization warehouse of the No. 13 Street depot to meet train parking needs. The scope of the expansion and renovation of the depot is mainly to expand the capacity of the service warehouse, including the addition of a 14-space parking and train inspection warehouse line and a new second-floor side span room on the west side.
In 2023, Anyang Railway Equipment Co., Ltd.(AT) provided DJK5-1 fastening systems, Type I Fastening systems, and WJ-2A Fastening Systems,Type-B Fastening systems for the joints to the Shenyang Metro Line 1 East Extension Line Mantang Parking Lot and Line 1 Thirteenth Street Vehicle Base Renovation and Expansion Projects , a total of 18,100 sets.
 
Type Drawing Unit Qty Remark
DJK5-1 Fastening Systems Urban rail 109 Set 10000 Anti-corrosion treatment is carried out, the iron tie plate is electrostatic sprayed, and the other parts are Sheradizing.
Type I Fastening systems Research line 0322, drawing TB/T 1495-2020 Set 5500 Anti-corrosion treatment is carried out, the iron tie plate is electrostatic sprayed, and the other parts are Sheradizing.
WJ-2A Fastening systems Research line 1114 Set 600 Anti-corrosion treatment is carried out, the iron tie plate is electrostatic sprayed, and the other parts are Sheradizing.
Type-B Fastening systems for the joints TB/T 1495-2020 Set 2000 Anti-corrosion treatment is carried out, the iron tie plate is electrostatic sprayed, and the other parts are Sheradizing.