FAQ
Projects
Location:
Home > Projects > Classic Case

76,814 sets of DT III2 fastening systems and 14,852 sets of Compression damping fastening systems to the Ningbo Rail Transit Line 7 project

Dec 27, 2023
The Ningbo Rail Transit Line 7 project starts from Yunlong Station and ends at Yufan Road Station. The length of Ningbo Rail Transit Line 7 is about 39.469km. It has 25 stations and 1 intermediate air shaft, including 11 transfer stations. There is a section of Line 7 along the entire line. One field, respectively, is the Xiayingnan depot and the Lianqun parking lot.
In 2023, Anyang Railway Equipment Co., Ltd.(AT) provided 76,814 sets of DT III2 fastening systems and 14,852 sets of Compression damping fastening systems to the Ningbo Rail Transit Line 7 project.
 
No.
Product

Specification

Material
Drawing
Unit

Qty
Unit weight(kg)/Volume(cm3)
Remark
1 Iron tie plate 333*180mm QT450-10 Urban rail 127-03 Pcs 76814 7.88kg  DT III2 fastening system
2 Rail clip Type-B 60Si2Mn TB/T
1495.4-92
Pcs 153628 0.449kg  DT III2 fastening system
3 Screw spike T30*155mm 45# DTB-13 Pcs 153628 0.961kg  DT III2 fastening system
4 Heavy spring washer 30 60Si2Mn GB7244-87 Pcs 153628 0.082kg  DT III2 fastening system
5 T -head bolt L=100mm Q235-A DTB-01 Pcs 153628 0.294kg  DT III2 fastening system
6 Nut M22 Q235-A DTB-02 Pcs 153628 0.15kg  DT III2 fastening system
7 Flat washer 22 Q235-A DTB-03 Pcs 153628 0.073kg  DT III2 fastening system
8 Rail clip Type B 60Si2Mn TB/T 1495.5 Pcs 29704 0.449kg Compression damping fastening system
9 Anchor bolt Type I 8.8 grade   Pcs 29704 1.15kg Compression damping fastening system
10 Anchor bolt Type II 8.8 grade   Pcs   1.24kg Compression damping fastening system
11 Heavy spring washer 30 60Si2Mn GB 7244 Pcs 29704 0.082kg Compression damping fastening system
12 Flat washer 22 Q235A DTB-03 Pcs 29704 0.073kg Compression damping fastening system
13 T -head bolt   5.6  grade DTB-01 Pcs 29704 0.294kg Compression damping fastening system
14 Nut 22 5 grade DTB-02 Pcs 29704 0.15kg Compression damping fastening system

DT III2 fastening systems factory - Anyang Railway Equipment

Share: