Track Fastening Systems for Chongqing Metro Line 6
May 28, 2021
Anyang Railway Equipment Co., Ltd(AT) provided DTVII2 fixed track fastening systems for Chongqing Metro Line 6.
Chongqing Rail Transit Line 6 is a backbone line from southeast to northwest in Chongqing rail transit network, and it is also the core transportation artery running through Chongqing Liangjiang New Area.
As of December 2020, the operating mileage of Chongqing Rail Transit Line 6 is 59.3 km, with a total of 28 stations, including 22 underground stations and 6 elevated stations; 6-group marshalling B-type trains are used.
Chongqing Rail Transit Line 6 is a backbone line from southeast to northwest in Chongqing rail transit network, and it is also the core transportation artery running through Chongqing Liangjiang New Area.
As of December 2020, the operating mileage of Chongqing Rail Transit Line 6 is 59.3 km, with a total of 28 stations, including 22 underground stations and 6 elevated stations; 6-group marshalling B-type trains are used.