FAQ
Projects
Location:
Home > Projects > Classic Case

Track Fastening Systems for Chongqing Metro Line 6

May 28, 2021
Anyang Railway Equipment Co., Ltd(AT) provided DTVII2 fixed track fastening systems for Chongqing Metro Line 6.

Chongqing Rail Transit Line 6
is a backbone line from southeast to northwest in Chongqing rail transit network, and it is also the core transportation artery running through Chongqing Liangjiang New Area.
As of December 2020, the operating mileage of Chongqing Rail Transit Line 6 is 59.3 km, with a total of 28 stations, including 22 underground stations and 6 elevated stations; 6-group marshalling B-type trains are used.

China Made Rail Fastening System for Chongqing Metro 6 - Anyang Railway Equipment China Made Rail Fastener Systems for Chongqing Metro 6 - Anyang Railway Equipment
China Manufacturer Rail Fastening System for Chongqing Metro 6 - Anyang Railway Equipment China Manufacturer Rail Fastening Systems for Chongqing Metro 6 - Anyang Railway Equipment
China Factory Fastener System for Chongqing Metro 6 - Anyang Railway Equipment China Factory Track Fastening System for Chongqing Metro 6 - Anyang Railway Equipment
China Manufacturer Track Fastening Systems for Chongqing Metro Line 6  China Factory Track Fastening Systems for Chongqing Metro Line 6

 
Share:
Related Products