Track Fastening Systems for Chengdu Metro Line 5
May 28, 2021
Anyang Railway Equipment Co., Ltd(AT) provided rail e-clips of DZIII-type fastening system, rail anchor bolts of DZIII-type fastening system, rail steel plates of DZIII-type fastening system, gauge-adjusting clip of DZIII-type fastening system, Type I track fastening systems etc for Chengdu Subway Line 5.
Chengdu Metro Line 5 is the seventh subway line completed in Chengdu, Sichuan Province, China. The first phase of construction started in September 2015, and the second phase of construction started in 2016. In December 2019 On the 27th, the first and second phases of the Chengdu Metro Line 5 (Huagui Road Station to Huilong Station) were opened for operation.
As of December 2019, the length of Chengdu Metro Line 5 is 49.02 km, of which, the length of underground line is 42 km, the length of elevated line is 7 km. There are 41 stations in total, including 36 underground and 5 elevated.
Chengdu Metro Line 5 is the seventh subway line completed in Chengdu, Sichuan Province, China. The first phase of construction started in September 2015, and the second phase of construction started in 2016. In December 2019 On the 27th, the first and second phases of the Chengdu Metro Line 5 (Huagui Road Station to Huilong Station) were opened for operation.
As of December 2019, the length of Chengdu Metro Line 5 is 49.02 km, of which, the length of underground line is 42 km, the length of elevated line is 7 km. There are 41 stations in total, including 36 underground and 5 elevated.