FAQ
Projects
Location:
Home > Projects > Classic Case

Railroad Castings for Chengdu Metro Line 3

May 28, 2021
Anyang Railway Equipment Co., Ltd(AT) provided castings for DZIII railroad fixed fasteners, castings for CZI railroad fixed fasteners etc railroad construction parts for Chengdu Subway Line 3.

Chengdu Metro Line 3 is the fourth subway line completed and operated in Chengdu, Sichuan Province, China. The first phase of the project opened on July 31, 2016. On December 26, 2018, the second-phase projectand the third-phase project were put into operation.
The total length of the Chengdu Metro Line 3 is 50.02 km, of which the length of underground line is 44.51 km, and the length of elevated and transitional sections are 5.51 km, a total of 37 stations are set up, including 34 underground stations and 3 elevated stations.

 Railroad Castings for Chengdu Metro Line 3 China Made Rail Fassteners for Chengdu Metro 4 - Anyang Railway Equipment
China Manufacturer Rail Fassteners for Chengdu Metro 4 - Anyang Railway Equipment China Supplier Rail Fassteners for Chengdu Metro 4 - Anyang Railway Equipment
Share:
Related Products