Rail Fasteners for Chengdu Metro Line 10
May 28, 2021
Anyang Railway Equipment Co., Ltd(AT) provided DZIII-type rail elastic clips for railroad, CZI type castings of rail fastening system etc for Chengdu Metro Line 10.
Chengdu Metro Line 10 is the fifth completed and operational subway line in Chengdu, Sichuan Province, China. The first phase of the project was opened on September 6, 2017 (Taipingyuan Station - Shuangliu Airport Terminal 2 Station), the second phase of the project (Shuangliu Airport Terminal 2 Station - Xinping Station) was opened on December 27, 2019, and the logo color is sapphire blue.
Chengdu Metro Line 10 starts from Taipingyuan Station, passes through Wuhou District, Shuangliu District, Xinjin District, and ends at Xinping Station, roughly in a northeast-southwest direction. The total length of the line is 37.98 km, of which the length of underground section is about 21.21 km, and the length of elevated section and transition section are about 16.77 km.
Chengdu Metro Line 10 is the fifth completed and operational subway line in Chengdu, Sichuan Province, China. The first phase of the project was opened on September 6, 2017 (Taipingyuan Station - Shuangliu Airport Terminal 2 Station), the second phase of the project (Shuangliu Airport Terminal 2 Station - Xinping Station) was opened on December 27, 2019, and the logo color is sapphire blue.
Chengdu Metro Line 10 starts from Taipingyuan Station, passes through Wuhou District, Shuangliu District, Xinjin District, and ends at Xinping Station, roughly in a northeast-southwest direction. The total length of the line is 37.98 km, of which the length of underground section is about 21.21 km, and the length of elevated section and transition section are about 16.77 km.