Rail Fastening Systems for Chengdu Metro Line 1
May 28, 2021
Anyang Railway Equipment Co., Ltd(AT) provided I-type separate fixed track fasteners with T bolts, nuts, A-type elastic clips, screws; DTVI2 fixed track fasteners with intermindiate e-clips, screw spikes, heavy-duty spring gaskets for Chengdu Subway Line 1.
Chengdu Metro Line 1 is the first completed and operated subway line in Chengdu, Sichuan Province, China, and the first subway line opened in western China. The second phase of the project was opened on July 25, 2015, and the third phase of the project was opened on March 18, 2018.
The total length of Chengdu Metro Line 1 is 41 km, all of which are underground lines; a total of 35 stations are set up, all of which are underground stations.
Chengdu Metro Line 1 is the first completed and operated subway line in Chengdu, Sichuan Province, China, and the first subway line opened in western China. The second phase of the project was opened on July 25, 2015, and the third phase of the project was opened on March 18, 2018.
The total length of Chengdu Metro Line 1 is 41 km, all of which are underground lines; a total of 35 stations are set up, all of which are underground stations.