FAQ
Projects
Location:
Home > Projects > Classic Case

Rail Fasteners for Beijing Metro Line 8

May 28, 2021
Anyang Railway Equipment Co., Ltd provided DTVI2 rail fastening system, DTVI2-T rail fastening system, Type I rail fastening system (for 50kg/m steel rail), Type I rail fastening system (for 60kg/m steel rail), DJK5-1 rail fastening system, ZX-3 railway tie plates, railway spring clips etc for Beijing Metro Line 8.
Beijing Subway Line 8 is the sixth completed and operational urban rail transit line in Beijing, China. The first phase of operation was opened on July 19, 2008, and the Olympic Sports Center Station was opened on October 9, 2008, on December 31, 2011, the northern section of the second phase opened for operation, on December 30, 2012, the southern section of the second phase opened for operation, and on December 28, 2013, the Changba liaison line and the remaining section of the second phase of the southern section opened for operation, December 2015 On December 26, Andriy North Street Station opened, the third phase of the southern section and the fourth phase opened on December 30, 2018, and the National Art Museum of China Station was opened, and the third phase of the north section was opened on December 31, 2021.
As of December 2021, the total length of Beijing Metro Line 8 is 51.6 km and a total of 35 stations, including 32 underground stations and 3 elevated stations.

 ZX-3 cast steel plates, railway elastic clips factory- Anyang Railway Equipment
 
Share:
Related Products